Wednesday, March 30, 2011
Stage 2
So we are still working on the yard. At this point in time we are working on sprinklers. Basically the entire process is just preparing for grass. Oh grass how we long for you. Anyway to the left you can see them "pulling our pipe". That means they used their fancy tractor thing to lay out the pipe all over the ground for us. It took them about an hour and a half instead of taking us weeks to dig trenches all over the yard. The second picture is all the pipes coming together by our back patio door. Now that all the pipes are in the ground we get to hook them all together, wire everything to boxes, and install the heads. Not counting putting together the drip systems for our flower beds and garden. And the final picture is a pre-patio. Tyler, my dad, and my brother put up the form-work Saturday and laid all the gravel. Then Tyler pushed some dirt up against it, now we just need the cement. Hopefully that will get put in tomorrow as long as the weather holds out.
Subscribe to:
Post Comments (Atom)
Pretty cool!! :)
ReplyDelete